Two auctions for delivery of electricity to cover transmission system losses will be organised on 23 June 2025, via MEPX trading platform for periods:

  • 1 July – 31 July 2025 (July 2025)
  • 1 August – 31 August 2025 (August 2025).

All interested participants, according to Long-term Trading Rules and Auction call on delivery of electricity to cover transmission system losses for period 1 July – 31 August 2025, are invited to participate in the auctions.

CGES will, in cooperation with MEPX and via MEPX trading platform, select the most favourable bidders for delivery of electricity for covering transmission system losses as follows:

Delivery period Profile: 00-24h (band) Total estimated volume (MWh)
01.07. – 31.07.2025. 5 MW 3720
Delivery period Profile: 00-24h (band) Total estimated volume (MWh)
01.08. – 31.08.2025. 5 MW 3720

Details regarding the selection are explained in the aforementioned rules.

Auctions will be held on Monday, 23 June 2025 from 09:00 – 11:00h via MEPX trading platform.

Details on Auction call for delivery of electricity for covering transmission system losses can be seen on the link below:

https://www.cges.me/novosti/tenderi/1400-poziv-za-nadmetanje

Share This Story, Choose Your Platform!