Four auctions for delivery of electricity to cover transmission system losses will be organised on 25 March 2024, via MEPX trading platform for periods:

  • 1 July – 30 September 2024 (Q3 2024)
  • 1 October – 31 December 2024 (Q4 2024)
  • 1 January – 31 December 2025 (year 2025).

All interested participants, according to Long-term Trading Rules and Auction call on delivery of electricity to cover transmission system losses for Q3 2024, Q4 2024 and 2025., are invited to participate in the auctions.

CGES will, in cooperation with MEPX and via MEPX trading platform, select the most favourable bidders for delivery of electricity for covering transmission system losses as follows:

Delivery period Profile: 00-24h (band) Total estimated volume (MWh)
01.07. – 30.09.2024. 5 MW 11040
Delivery period Profile: 00-24h (band) Total estimated volume (MWh)
01.10. – 31.12.2024. 5 MW 11045
Delivery period Profile: 00-24h (band) Total estimated volume (MWh)
01.01. – 31.12.2025. 5 MW 43800
Delivery period Profile: 00-24h (band) Total estimated volume (MWh)
01.01. – 31.12.2025. 5 MW 43800

Details regarding the selection are explained in the aforementioned rules.

Auctions will be held on Monday, 25 March 2024 from 09:00h – 11:00h via MEPX trading platform.

Details on Auction call for delivery of electricity for covering transmission system losses can be seen on the link below:

https://www.cges.me/novosti/tenderi/1264-poziv-za-nadmetanje

Share This Story, Choose Your Platform!